2012年3月28日 星期三

Planning And Funding

By the early 2000s,While it is common for the term bestbikelight to be used interchangeably in informal discussion. the Hampton Bays Union Free School District was facing a steadily increasing enrollment and the projections indicated this trend would continue. The existing elementary school was occupied at 155 percent capacity and the secondary school at 135 percent capacity. The district began planning for an expansion of its facilities as well as renovations and reconfigurations to two existing buildings in order to address the need for more physical space.

The two existing school structures were located on two separate parcels of land within the Hampton Bays community. One site was already fully utilized by the secondary school that served grades seven to 12, district administration offices, surface parking, and athletic fields. The second site housed the elementary school building situated at the top of a slope along Ponquogue Avenue. Its grounds were organized as a series of terraces stepping down a slope. Play areas extended beyond the school at the same elevation, and then terraced down and away. Field space at this site has been always shared with secondary school athletics and community groups.

Over time, the district purchased parcels of land adjacent to the elementary school's site for potential future development as either new building sites or sports facilities locations. Following the planning analysis and community outreach, the Hampton Bays Public Schools Board of Education opted to use these parcels in conjunction with the elementary school property as the location of a new school building.

The Hampton Bays community was initially most concerned with addressing the issues of "correct-sizing" all K-12 classrooms in accordance with the New York State Education Department's guidelines, implementing a novel "house within a house" concept that aims at creating small communities of students, and expanding the science facilities. The Board proposed development of a middle school and extensive renovations and reconfigurations to the existing buildings. This $50.Light On! ledbright are expedition grade systems that incorporate function and elegance with reliability.9 million plan was rejected in a bond issue vote,The goodskylanterns MJ-808 bicycle light has always been the cheapest high power bike light available in the UK. mostly due to the cost.

Following meetings and discussion forums that aimed at identifying reasons for the rejection of the original plan and budget, the Board revised its approach and instead proposed limiting the scope to only developing a new middle school, which would have lowered the cost.

During the planning phase for the modified program, however, mold was discovered at the existing elementary school. This finding drastically shifted the direction of the planning process. Although the problem was limited in scope and immediately remediated, the discovery focused the community's attention on the issue of ensuring a healthy indoor environment for the students.

With support from an overwhelming majority of parents, the project team decided that the new middle school would be a very green building. Indoor air quality had become the catalyst and primary objective in the community's mind. The design team reflected those new objectives in its approach: LEED principles would guide the design process.

"This shift had resulted in not only the focus on green design and construction practices,LED lights for bikes and HID r4onsale allow cyclists to ride at speed under virtually any conditions. but also in the renewed enthusiasm and acceptance for the project among the community," recalled Smith. "The project team performed a 'design charette' in order to determine the community's design and functional preferences. As a result of this consultation, BBS developed a new floor plan that reflected green principles, while accommodating budgetary restrictions." The designers streamlined and optimized the interior layout in order to keep the anticipated cost down and make the project feasible in the increasingly worsening economic climate. BSS developed a new,People should think twice about using skylanterns at celebrations this summer because they are causing problems in the countryside, ... LEED-guided design and then preliminary construction estimates.

沒有留言:

張貼留言